(WPXI) PITTSBURGH — Multiple traffic changes and ramp closures will begin soon for long-term bridge repair work on Interstate 579. PennDOT officials say a new traffic configuration from southbound I-279 (Parkway North) to southbound I-579 will begin in Pittsburgh Sunday at 10 a.m., weather permitting. The changes are being made so crews from Swank Construction can repair bridges on I-579, after inspectors found several deteriorated piers on I-579 and its HOV lanes. Here’s what the new configuration will look like: southbound I-279 traffic to southbound I-579 will be crossed over into the I-279 HOV lanes approximately 500 feet south of the Swindell Bridge. The crossover into the I-279 HOV lanes will be made from the left-hand lanes of southbound I-279. Crossed over traffic will continue from the I-279 HOV lanes into the I-579 HOV lanes. Once on the Veterans Bridge, traffic from the southbound I-579 HOV lanes will be crossed back over into the southbound I-579 lanes. Two 11-foot lanes will be maintained in this new configuration.
I-579 To Be Reconfigured Starting Sunday
July 11, 2025 8:34 pm